Water risk management plan review log
Records reviews of the site water risk management plan covering system changes, control performance, sampling trends and actions, with sign-off. A live form your crew fills on their phones, not a Word template you retype on every site.
- Reviews of the site water risk management plan covering system changes
- Control performance
- Sampling trends
- Actions
- With sign-off
This form, the other 276 in the library and Eaco AI, live in your workspace the moment you subscribe. Branded to your business, ready on your phone in minutes. Cancel anytime.
Rendered from the live form itself. Your logo replaces the placeholder the day you subscribe.
When you need this form
Cooling towers, warm water systems and thermostatic mixing valves need their risk management plan reviewed on a schedule, not filed and forgotten. Reviews happen after system changes, plant replacement, sampling exceedances or a change of contractor. Building owners and health authorities expect a documented review cycle for water systems, and it is usually the first record requested when Legionella control comes under scrutiny.
A live log settles the question of whether the review actually happened. Each entry carries the reviewer, the date, the sampling trend that prompted it and the actions raised, all timestamped. Paper minutes get retyped and lost. A filled record hands your client or auditor the full review history in one export, with sign-off attached.
What good looks like
- Review date, reviewer name and the plan version being assessed.
- System changes since last review: new plant, dead legs, tenancy alterations.
- Sampling trends recorded, with exceedances and the response actions taken.
- Control performance checked: temperatures, disinfectant levels, mixing valve service records.
- Actions assigned with owners and due dates, closed out at sign-off.
Water risk management plan review log, answered
Is this a PDF or Word template?
Neither. It is a live form: your crew opens it on their phones, ticks it through, attaches photos and signs on the glass. Every submission is timestamped, GPS-pinned and stored as proof.
How often should a water risk management plan be reviewed?
Most sites review annually and again after any system change, outbreak concern or sampling exceedance. Clients and auditors look for a dated review history with actions closed out, not a single plan written once.
What goes in a water risk management plan review log?
Reviewer and date, changes to the water system, control performance data, sampling trends, actions raised and sign-off. Photo evidence of plant and valve records makes the entry defensible later.
Can I buy just this one form?
It comes with the plan: this form, the other 276 in the library and Eaco AI for $29 a month, GST included. Cancel anytime.
Forms that work alongside it
Browse all 277 formsAll included in the plan.

